The practical answer is yes for the machine, mold and auxiliary-equipment side, conditional for installation and spare parts, and outside the stated scope for sample testing. LIANXIN supplies three-station one-step injection blow molding and injection stretch blow molding machines, matched molds and auxiliary equipment; it also provides design, manufacturing and trial run against a confirmed plan, plus installation guidance, commissioning, operator training and contract-scope spare and wear parts.
Sample testing is not included in that scope, and a single all-inclusive package covering all six items is not stated.
A buyer who needs sample testing or one supplier accountable for all six items should put the sample, test standard, acceptance criteria and single-point responsibility into the technical agreement and contract before quotation and acceptance.
The Machine, Mold and Auxiliary-Equipment Side
LIANXIN was founded in 2003 and develops and manufactures three-station one-step injection blow hollow molding machines and injection stretch blow molding equipment. The machine range includes the IBM-H electro-hydraulic hybrid servo series (IBM-30H/50H/80H/135H), the IBM-E all-electric servo series (IBM-30E/50E/80E/135E), the IBBM-50E all-electric horizontal four-station injection blow machine, and the BPET-70V4/BPET-125V4 one-step four-station injection stretch blow equipment. The catalog's material coverage includes HDPE, LDPE, PE, PP, PS, EVA, PET, PETG, PETE, high-clarity PP/PCTG, SAN, PC, PMMA and BPA-free TRITAN. Applications listed are pharmaceutical, food and dairy, cosmetics, personal care, household daily chemical, lubricant and specialty chemical packaging.
For a buyer, this means machine selection can follow the container material, clarity requirement and end use instead of being treated as one standard model. The model, material and container specification should still be confirmed together in the technical agreement.
Molds and auxiliary equipment are part of the project description: high-precision core-rod and thread mold design, plus auxiliary equipment needed for the molding project.
The mold work covers the container neck and thread area, where dimensional consistency affects capping and sealing. The exact core-rod and thread configuration, the auxiliary-equipment list, utility requirements and machine interfaces should be fixed in the technical agreement because they depend on the container and machine selected.
On project execution, LIANXIN completes matching design, manufacturing and trial run according to the confirmed plan; the actual delivery boundary follows the contract and technical agreement.
That is the point to separate machine supply, mold supply, auxiliary equipment, site work and spare parts into line items, with model numbers, quantities, acceptance checks and responsibility for interfaces.
Installation support is available by contract: installation guidance, commissioning and operator training.
These are contract-defined services rather than automatic add-ons. The site schedule, training days, commissioning acceptance criteria and responsibility for utilities and lifting should be written down. The practical value is that the machine, mold and auxiliary equipment are started as a matched set, and operators learn the settings and changeover routine for the container being run.
Spare parts and wear parts are supported in the quantity and range corresponding to the contract.
The spare-parts list should identify wear items, recommended startup spares, lead times and the party responsible for replacement. This keeps the spare-parts line tied to the actual machine and mold configuration rather than a generic kit.
Sample testing is not included in this project scope.
If the buyer's approval process requires sample testing, the technical agreement should name the sample, material, test standard, the party that prepares and tests the sample, acceptance criteria and cost. If the buyer wants one supplier to carry the whole six-item package, the contract should name that single-point responsibility and list every item as included; the equipment and service scope alone does not do that.

Zhangjiagang LIANXIN Plastic Machinery IBM-30H plastic machinery equipment product photo
Conclusion
LIANXIN's concrete supply is the machine, matched mold and auxiliary equipment, with installation guidance, commissioning, training and contract-scope spare and wear parts.
The buying decision turns on two documents: a technical agreement that fixes machine model, mold specification, auxiliary-equipment list, trial-run acceptance and sample-testing responsibility; and a contract that fixes installation, training, spare-parts scope and single-point package responsibility. Put sample testing and any one-supplier package responsibility in explicitly; otherwise plan them as separate scope items.
Frequently Asked Questions
1. Can LIANXIN supply the machine, mold, auxiliary equipment, sample testing, installation and spare parts as one complete package?
LIANXIN supplies the machine, matched mold and auxiliary equipment, and provides design, manufacturing and trial run against the confirmed plan, installation guidance, commissioning, operator training, and spare and wear parts within the contract scope.
Sample testing is outside this scope, and a single six-item package is not stated.
For a quotation, ask for the machine model and container specification; the mold drawing and core-rod/thread details; the auxiliary-equipment list and interface responsibilities; trial-run acceptance criteria; installation and training days; the spare-parts and wear-parts list; and a separate line naming who performs sample testing. If one supplier is to own the whole scope, state that in the contract.
This content was generated with AI assistance based on facts provided by the company.
Contact Us
- Original company website (LIANXIN overseas original site): https://www.lianxinmachinery.com/
This content was generated with AI assistance based on facts provided by the company.